Quantcast
Channel: Bentley Communities
Viewing all articles
Browse latest Browse all 4605

What’s New in LEAP Bridge Steel CONNECT Edition V18?

$
0
0

LEAP Bridge Steel CONNECT Edition V18 contains enhancements and bug fixes.

Enhancements

  • Response Spectrum Analysis (RSA) 
  • Design Optimization for Tub-Girders 
  • New Cross-Frame Locations Wizard 
  • Phase I for PennDOT Design Manual - Part 4 Design Checks (it will be followed by Phase II and III for full compliance)
  • Z Type Cross-Frame Definition 
  • Double Sections for Cross-Frame Members

  

Bug Fixes

This release fixes a number of issues including:

  • Defect regarding analytical model generation for some models
  • Incorrect placement of double bearings for tub-girder bridges
  • Error in section compactness check in AASHTO 6.10.6.2.2
  • Incorrect location of field splice in field splice design report

For the detailed release notes, see the attached PDF file.


Viewing all articles
Browse latest Browse all 4605

Latest Images

Trending Articles



Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>