Quantcast
Channel: Bentley Communities
Viewing all articles
Browse latest Browse all 4605

Release Announcement: RM Bridge Concrete CONNECT Edition V11 Update 6

$
0
0

RM Bridge Concrete CONNECT Edition V11 Update 6 includes important features to enhance BIM workflow, user experience, and product performance:

  1. BIM Workflow: Transfer Cross-frames from OpenBridge Modeler (OBM) to RM
  2. FEM Enhancements: Composite Forces in Partial Composite Cross-sections
  3. Optimization for Wind Load Analysis
  4. Optimization for Live Load Analysis
  5. Enhancement in Lane Definition in Analyzer
  6. New Option for Length Measurement in Modeler and Analyzer
  7. New Option for Presenting Eigen Mode Shape Information in Results
  8. Response Spectra Per South Korean Standard (KDS17:2018)
  9. Enhancements in GUI
  10. Error Corrections

Viewing all articles
Browse latest Browse all 4605

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>