RM Bridge Concrete CONNECT Edition V11 Update 6 includes important features to enhance BIM workflow, user experience, and product performance:
- BIM Workflow: Transfer Cross-frames from OpenBridge Modeler (OBM) to RM
- FEM Enhancements: Composite Forces in Partial Composite Cross-sections
- Optimization for Wind Load Analysis
- Optimization for Live Load Analysis
- Enhancement in Lane Definition in Analyzer
- New Option for Length Measurement in Modeler and Analyzer
- New Option for Presenting Eigen Mode Shape Information in Results
- Response Spectra Per South Korean Standard (KDS17:2018)
- Enhancements in GUI
- Error Corrections